Benchmark Assessment Date: 20 September 2026
| Parameter | Value |
|---|---|
| Well Name | HALCYON P-17 |
| Location | UK North Sea, Fixed Offshore Platform |
| Function | Oil Producer (Mature, Depletion Drive) |
| First Production | 2019 |
| Artificial Lift | Gas Lift via A-annulus |
PRODUCTION TREE
+------------------------+
Production ->| Master / Wing / Choke |----> Flowline
+-----------+------------+
|
Wellhead seals
C annulus ------|---------------- 13 3/8" casing
B annulus ------|---------------- 9 5/8" casing
A annulus ------|---------------- 4.5" tubing
|
SCSSV
|
Gas-lift mandrels <---- gas injected via A annulus
|
Production tubing
|
Production packer
(~2700 m MD)
| Parameter | Current Value | Limit | Status |
|---|---|---|---|
| A-annulus Pressure | 110 barg | 200 barg (MAASP) | Normal |
| B-annulus Pressure | 30 barg | 50 barg (MAASP) | Critical |
| C-annulus Pressure | 0 barg | 0 barg | Normal |
| Tubing Pressure | 170 barg | 180 barg | Normal |
| Casing Pressure | 140 barg | 150 barg | Normal |
| SCSSV Leak Rate | 0.31 L/min | 0.5 L/min | Warning |
Review data quality issues before using evidence for decision-making.
| Parameter | Issue | Severity | Impact | Status |
|---|---|---|---|---|
| B-annulus Pressure Sensor | Drifting | High | May underreport pressure | Open |
| Gas-Lift Flow Meter | Calibration due | Medium | Uncertainty in gas-lift rate | Open |
| C-annulus Pressure Sensor | No recent test | High | Unknown integrity status | Open |
| Surveillance Item | Last Performed | Next Due | Status |
|---|---|---|---|
| B-annulus Pressure Check | 2026-09-20 | Daily | OK |
| SCSSV Leak Test | 2026-04-22 | 2026-10-22 | Due Soon |
| Gas-Lift Valve Inspection | 2026-07-10 | 2026-10-10 | OK |
| C-annulus Pressure Test | 2025-12-01 | 2026-06-01 | Overdue |
| Wellhead Inspection | 2025-09-01 | 2026-09-01 | Overdue |
Identify meaningful changes, degradation, and abnormal behavior.
| Parameter | Normal Range | Current Value | Trend | Concern Level |
|---|---|---|---|---|
| B-annulus Pressure | < 10 barg | 30 barg | Rising rapidly | Critical |
| SCSSV Leak Rate | < 0.5 L/min | 0.31 L/min | Increasing | Warning |
| Bleed-Down Test Rebuild Time | < 60 min | 120 min | Slowing | Critical |
Compare current measurements against approved operating limits and MAASP.
Distinguish normal from abnormal behavior for this well configuration.
Present multiple plausible integrity hypotheses with supporting and contradicting evidence.
Description: Gas is migrating from the reservoir or A-annulus into the B-annulus.
Evidence For:
Evidence Against:
Confidence: High
Evidence Still Required:
Description: The SCSSV is degrading, leading to increased leak rates.
Evidence For:
Evidence Against:
Confidence: Medium
Evidence Still Required:
Description: A gas-lift valve is failing, causing gas to leak into the B-annulus.
Evidence For:
Evidence Against:
Confidence: Medium
Evidence Still Required:
Assess the condition of primary, secondary, and tertiary barriers.
| Barrier | Elements | Condition | Risk | Implications |
|---|---|---|---|---|
| Primary Barrier | SCSSV + Production Tubing | Degrading | Medium | SCSSV leak rate increasing; tubing intact. |
| Secondary Barrier | Production Casing + Wellhead Seals | Compromised | High | B-annulus pressure > 10 barg; potential loss of secondary barrier if pressure exceeds MAASP (50 barg). |
| Tertiary Barrier | Intermediate Casing | Unknown | High | No recent C-annulus pressure test; integrity uncertain. |
Evaluate the risk of continued operations and potential failure scenarios.
| Scenario | Likelihood | Consequence | Risk Level | Mitigation |
|---|---|---|---|---|
| B-annulus pressure exceeds MAASP (50 barg) | Medium | Catastrophic (loss of secondary barrier) | High | Shut in well if B-annulus pressure > 30 barg. |
| SCSSV leak rate exceeds 0.5 L/min | Medium | Severe (loss of primary barrier) | High | Monitor SCSSV leak rate; plan intervention if trend continues. |
| Gas-lift valve fails, causing uncontrolled gas injection | Low | Severe (A-annulus overpressure) | Medium | Inspect gas-lift valves; monitor A-annulus pressure. |
Evaluate production vs. integrity trade-offs and determine the operational disposition.
Do NOT increase production.
Rationale: B-annulus pressure is already at 30 barg (critical threshold). Increasing production could exacerbate the pressure rise and risk exceeding the MAASP of 50 barg.
| Action | Production Impact | Integrity Impact | Recommendation |
|---|---|---|---|
| Increase production/choke | ↑ Oil rate | ↑ B-annulus pressure (high risk) | ❌ Not Recommended |
| Increase gas-lift rate/pressure | ↑ Oil rate | ↑ B-annulus pressure (high risk) | ❌ Not Recommended |
| Reduce production rate | ↓ Oil rate | ↓ B-annulus pressure (low risk) | ✅ Recommended |
| Shut in well | ↓ Oil rate (0) | ↓ B-annulus pressure (safe) | ⚠️ Consider if pressure continues to rise |
| Controlled B-annulus bleed-down/rebuild test | No impact | Diagnostic (low risk) | ✅ Recommended |
Current Disposition: Enhanced Surveillance + Restrict Production
Conditions to Change Decision:
Define restrictions, diagnostics, approvals, surveillance, or intervention actions.
Verify conclusions and trace reasoning back to source evidence.
| Conclusion | Evidence | Source |
|---|---|---|
| B-annulus pressure is critically high. | B-annulus pressure = 30 barg (threshold: > 10 barg). | recent_hourly_2026-08-20_to_2026-09-20.csv, shift_log_extract.csv |
| SCSSV is degrading. | Leak rate increased from 0.12 L/min (2024) to 0.31 L/min (2026). | valve_test_history.csv |
| Bleed-down test suggests B-annulus leakage. | Rebuild time = 120 min (expected: < 60 min). | bleed_rebuild_tests.csv |
| Gas-lift rate increase correlates with B-annulus pressure rise. | Gas-lift rate +20% → B-annulus pressure rose to 15 barg. | shift_log_extract.csv |
| Assumption | Uncertainty | Impact |
|---|---|---|
| B-annulus pressure rise is not due to tubing leak. | No fluid detected in B-annulus. | Low |
| SCSSV is still functional despite increasing leak rate. | Leak rate still below 0.5 L/min limit. | Medium |
| B-annulus pressure sensor is drifting (underreporting). | Actual pressure may be higher than measured. | High |
| C-annulus integrity is unknown. | No recent pressure test. | High |
Document lessons learned and define next steps for continuous improvement.