HALCYON P-17 Well Integrity Decision Workbench

Benchmark Assessment Date: 20 September 2026

Well Configuration & Operating Limits

Well Identity

ParameterValue
Well NameHALCYON P-17
LocationUK North Sea, Fixed Offshore Platform
FunctionOil Producer (Mature, Depletion Drive)
First Production2019
Artificial LiftGas Lift via A-annulus

Completion Schematic

                    PRODUCTION TREE
              +------------------------+
 Production ->| Master / Wing / Choke  |----> Flowline
              +-----------+------------+
                          |
                     Wellhead seals
          C annulus ------|---------------- 13 3/8" casing
          B annulus ------|---------------- 9 5/8" casing
          A annulus ------|---------------- 4.5" tubing
                          |
                        SCSSV
                          |
                  Gas-lift mandrels  <---- gas injected via A annulus
                          |
                    Production tubing
                          |
                  Production packer
                    (~2700 m MD)
        

Operating Limits & MAASP

ParameterCurrent ValueLimitStatus
A-annulus Pressure110 barg200 barg (MAASP)Normal
B-annulus Pressure30 barg50 barg (MAASP)Critical
C-annulus Pressure0 barg0 bargNormal
Tubing Pressure170 barg180 bargNormal
Casing Pressure140 barg150 bargNormal
SCSSV Leak Rate0.31 L/min0.5 L/minWarning

Data Quality & Trustworthiness

Review data quality issues before using evidence for decision-making.

Data Quality Register

ParameterIssueSeverityImpactStatus
B-annulus Pressure SensorDriftingHighMay underreport pressureOpen
Gas-Lift Flow MeterCalibration dueMediumUncertainty in gas-lift rateOpen
C-annulus Pressure SensorNo recent testHighUnknown integrity statusOpen

Surveillance Status

Surveillance ItemLast PerformedNext DueStatus
B-annulus Pressure Check2026-09-20DailyOK
SCSSV Leak Test2026-04-222026-10-22Due Soon
Gas-Lift Valve Inspection2026-07-102026-10-10OK
C-annulus Pressure Test2025-12-012026-06-01Overdue
Wellhead Inspection2025-09-012026-09-01Overdue

Anomaly Detection

Identify meaningful changes, degradation, and abnormal behavior.

B-annulus Pressure Trend (Recent Hourly Data)

SCSSV Leak Rate Trend

Gas-Lift Rate vs. B-annulus Pressure

Key Anomalies

ParameterNormal RangeCurrent ValueTrendConcern Level
B-annulus Pressure< 10 barg30 bargRising rapidlyCritical
SCSSV Leak Rate< 0.5 L/min0.31 L/minIncreasingWarning
Bleed-Down Test Rebuild Time< 60 min120 minSlowingCritical

Compare Measurements Against Limits

Compare current measurements against approved operating limits and MAASP.

Pressure vs. MAASP

Historical Trends (Monthly Data)

Interpret Observations

Distinguish normal from abnormal behavior for this well configuration.

Normal Behavior

Abnormal Behavior

Hypothesis Assessment

Present multiple plausible integrity hypotheses with supporting and contradicting evidence.

🔹 Hypothesis 1: Gas Migration into B-annulus

Description: Gas is migrating from the reservoir or A-annulus into the B-annulus.

Evidence For:

Evidence Against:

Confidence: High

Evidence Still Required:

🔹 Hypothesis 2: SCSSV Degradation

Description: The SCSSV is degrading, leading to increased leak rates.

Evidence For:

Evidence Against:

Confidence: Medium

Evidence Still Required:

🔹 Hypothesis 3: Gas-Lift Valve Failure

Description: A gas-lift valve is failing, causing gas to leak into the B-annulus.

Evidence For:

Evidence Against:

Confidence: Medium

Evidence Still Required:

Barrier Assessment

Assess the condition of primary, secondary, and tertiary barriers.

Barrier Status

BarrierElementsConditionRiskImplications
Primary Barrier SCSSV + Production Tubing Degrading Medium SCSSV leak rate increasing; tubing intact.
Secondary Barrier Production Casing + Wellhead Seals Compromised High B-annulus pressure > 10 barg; potential loss of secondary barrier if pressure exceeds MAASP (50 barg).
Tertiary Barrier Intermediate Casing Unknown High No recent C-annulus pressure test; integrity uncertain.

Cumulative Integrity Concerns

Assess Risk

Evaluate the risk of continued operations and potential failure scenarios.

Risk Matrix

ScenarioLikelihoodConsequenceRisk LevelMitigation
B-annulus pressure exceeds MAASP (50 barg) Medium Catastrophic (loss of secondary barrier) High Shut in well if B-annulus pressure > 30 barg.
SCSSV leak rate exceeds 0.5 L/min Medium Severe (loss of primary barrier) High Monitor SCSSV leak rate; plan intervention if trend continues.
Gas-lift valve fails, causing uncontrolled gas injection Low Severe (A-annulus overpressure) Medium Inspect gas-lift valves; monitor A-annulus pressure.

Operational Decision

Evaluate production vs. integrity trade-offs and determine the operational disposition.

Current Recommendation

Do NOT increase production.

Rationale: B-annulus pressure is already at 30 barg (critical threshold). Increasing production could exacerbate the pressure rise and risk exceeding the MAASP of 50 barg.

Production vs. Integrity Trade-offs

ActionProduction ImpactIntegrity ImpactRecommendation
Increase production/choke ↑ Oil rate ↑ B-annulus pressure (high risk) ❌ Not Recommended
Increase gas-lift rate/pressure ↑ Oil rate ↑ B-annulus pressure (high risk) ❌ Not Recommended
Reduce production rate ↓ Oil rate ↓ B-annulus pressure (low risk) ✅ Recommended
Shut in well ↓ Oil rate (0) ↓ B-annulus pressure (safe) ⚠️ Consider if pressure continues to rise
Controlled B-annulus bleed-down/rebuild test No impact Diagnostic (low risk) ✅ Recommended

Operational Disposition

Current Disposition: Enhanced Surveillance + Restrict Production

Conditions to Change Decision:

Actions Required

Define restrictions, diagnostics, approvals, surveillance, or intervention actions.

Immediate Actions

Surveillance Actions

Approval Requirements

Verification

Verify conclusions and trace reasoning back to source evidence.

Key Conclusions & Evidence

ConclusionEvidenceSource
B-annulus pressure is critically high. B-annulus pressure = 30 barg (threshold: > 10 barg). recent_hourly_2026-08-20_to_2026-09-20.csv, shift_log_extract.csv
SCSSV is degrading. Leak rate increased from 0.12 L/min (2024) to 0.31 L/min (2026). valve_test_history.csv
Bleed-down test suggests B-annulus leakage. Rebuild time = 120 min (expected: < 60 min). bleed_rebuild_tests.csv
Gas-lift rate increase correlates with B-annulus pressure rise. Gas-lift rate +20% → B-annulus pressure rose to 15 barg. shift_log_extract.csv

Assumptions & Uncertainties

AssumptionUncertaintyImpact
B-annulus pressure rise is not due to tubing leak. No fluid detected in B-annulus. Low
SCSSV is still functional despite increasing leak rate. Leak rate still below 0.5 L/min limit. Medium
B-annulus pressure sensor is drifting (underreporting). Actual pressure may be higher than measured. High
C-annulus integrity is unknown. No recent pressure test. High

Lessons Learned & Next Steps

Document lessons learned and define next steps for continuous improvement.

Lessons Learned

Next Steps